Case Study — Tivaouane · System O)) — Tx‑H2O
Projects/ Senegal/ Tivaouane
✅ Operational 🕌 Community 🇸🇳 Senegal ⭐ Flagship project

System O)) — The Great Mosque of Tivaouane (
)

📍 Tivaouane, Thiès Region
📅 2024
🤝 Partnership with ONAS
Project Overview

Renovation of the Great Tidjane Mosque in Tivaouane

Tivaouane is one of Senegal’s holy cities and the capital of the Tidjaniyya brotherhood. Its Grand Mosque welcomes tens of thousands of worshippers during religious ceremonies—particularly during the annual ziarra. Faced with this large-scale sanitation challenge, Tx-H2O deployed a System O)) designed to handle exceptional crowds, in direct partnership with the National Sanitation Office of Senegal (ONAS).

The project has now become a benchmark for sanitation in places of worship and high-traffic sites in West Africa.

0
Power requirement
s for processing
100%
Compliance with ONAS standards (
)
30 years
Maintenance-free mechanical
Photo gallery
Tivaouane - Main Facility
System O)) as an installation
Tivaouane Construction Site
Background & Challenge

A high-traffic website, the highest standards

The Great Mosque of Tivaouane presents unique sanitation challenges: visitor numbers vary greatly depending on the time of year—ranging from a few hundred on weekdays to tens of thousands during ziarra—and the need for absolute reliability in a sacred place.

Custom sizing tailored to accommodate peak crowds on ziarra days
Passive technology — zero energy consumption, zero risk of power outages
Authorization application prepared and approved by ONAS
Installation completed without disrupting site operations
Odorless treated water that is safe for the groundwater
Project Timeline

Installation steps

01
Site survey & sizing

Hydrogeological analysis of the site, assessment of daily flow rates and peak flows, calculation of the optimal design parameters for System O.

02
Compiling the ONAS File

Tx-H2O assisted the mosque committee in preparing the complete application package for submission to ONAS.

03
Earthwork & Installation

Installation of the waterproof geomembrane, installation of the biological reactor and System O piping, backfilling with tested filter sand.

04
Connections & Commissioning

Connection to the mosque’s wastewater collection system, flow and effluent quality tests, ONAS certification, and official commissioning.