🇹🇬 Togo Ellipse Projects

Lomé & Kara —
Hospital wastewater treatment plants

Design, supply, installation, and commissioning of two wastewater treatment plants (WWTPs) for the hospitals in Lomé (332 beds) and Kara (345 beds), carried out on behalf of Ellipse Projects.

2 hospitals treated
332 + 345 beds
Environmental and Health Standards
Contractual deadlines met
Lomé Project
📍 Lomé, Togo

STEP for the 332-bed hospital — Lomé

As part of the project carried out in Lomé on behalf of Ellipse Projects, Tx-H2O handled the complete design, equipment supply, installation, and commissioning of the wastewater treatment plant for the 332-bed hospital.

The wastewater treatment plant was designed to handle the hydraulic and organic loads generated by a hospital of this size, in strict compliance with current environmental and health standards.

All work was carried out in accordance with the technical specifications, including adherence to contractual deadlines, the selection of materials and equipment that met the required performance standards, and rigorous monitoring through to commissioning.

Collaboration with Ellipse Projects Constant, proactive, and transparent communication throughout the various phases of the project—contributing to the smooth execution of this strategic initiative in West Africa.
Commissioning of a wastewater treatment plant — Lomé
Opening · 332-bed hospital
City
🇹🇬 Lomé, Togo
Customer
Ellipse Projects
Capacity
332-bed hospital
Type
Inpatient STEP
Hospital-based STEP — Kara, Togo
Wastewater Treatment Plant · Kara, Togo
City
🇹🇬 Kara, Togo
Customer
Ellipse Projects
Capacity
345-bed hospital
Type
Inpatient STEP
Project Kara
📍 Kara, Togo

Wastewater treatment plant for the 345-bed hospital — Kara

As part of the project carried out in Kara on behalf of Ellipse Projects, Tx‑H2O handled the complete design, equipment supply, installation, and commissioning of the wastewater treatment plant for the 345-bed hospital.

The wastewater treatment plant was designed to handle the hydraulic and organic loads of a hospital of this size, in compliance with current environmental and health standards.

  • Strict adherence to contractual deadlines
  • Selection of materials and equipment that meet the expected performance standards
  • Close monitoring of project progress through to commissioning
  • Constant and transparent communication with the Ellipse Projects teams

Our collaboration with the teams at Ellipse Projects was professional and efficient, contributing to the smooth execution and success of this strategic project for Tx-H2O in West Africa.